Technical Session 22: Optimisation of Drilling Well Planning and Execution
Wednesday, 19 February
Room 401-402, Level 4
Technical Session
-
0200-0230 24685Evaluation of Enhanced Drilling Dynamic Sensor Positioning in Drill String Resulted in Substantial Improvements of Operational Efficiency and Cost Reduction: North Sea Case Study Analysis
-
0230-0300 24945World Longest 9.625-inch X 12.25-inch Non-directionalcasing While Drilling in a Production Hole Section Through Highly Interbedded Andunstable Formations in an Operator
-
0300-0330 24749A Total Optimisation Drilling System Approach Delivering a Critical Build-up Section in the Middle East