Technical Session 26: Well Integrity and Well Intervention
Wednesday, 19 February
Room 408-409
Technical Session
-
1400-1430 24956Efforts To Return New Suspended Offshore Dry-gas Wells To Production: First Successful Of A Rigless Conversion Subsurface Safety Valve From Tubing Retrievable To Wireline Retrievable In Indonesia
-
1430-1500 25033Innovative Real-time Diagnostic E-line Milling And Fishing Technologies For Enhanced Downhole Fishing Operations
-
1500-1530 24752Navigating High-pressure Realms: The Synergistic Application Of Instrumented Coiled Tubing And Through Tubing Inflatable Packers For Well Integrity Restoration In West Kuwait Workovers: A Novel Case Study.
-
Alternate 24885Mitigating Abnormal SCP Towards Continued Productions Through Advanced Analysis Of Monitored Data
-
Alternate 25063Assessing Production Casing Challenges In Workover Operations: Insights From Southern Iraq
-
Alternate 25017Leak Identification Revolutionized: A Cost-Effective, Paradigm-shifting Approach Using Coiled Tubing And Distributed Temperature Sensing (dts)—A Case Study From North Kuwait
-
Alternate 25083Breakthrough Drill Pipe Conveyed Technology Overcomes Long Lasting Wireline Limitations In Cement Bond Evaluation And Casing Inspection.