Technical Session 31: Drilling Fluids and Cementing
Wednesday, 19 February
Room 408-409
Technical Session
-
1600-1630 24753Study Of Cellulose Nanomaterials And Solid Particles Synergistically Stabilising Foam Drilling Fluids
-
1630-1700 24936Managed Pressure Cementing Allowed Flexibility Of Adjusting 3-variables To Minimize The Losses Rate Instantly During Cementing Hence Assuring Well Integrity, A Case Study
-
1700-1730 24935A Novel Spacer & Slurry Design To Cure Severe Losses In Depleted Formation - Case History From Southern Oman
-
Alternate 24931Cementing A High Co2 Gas Injection Well Offshore West Africa; A 3 Step Design Approach To Ensure Long-term Integrity.
-
Alternate 24819Eliminating Pack-off And High Circulating Pressure During Well Cementing. Case Studies From Ecuador.
-
Alternate 25055Managing High Bottom-hole Circulating Temperature Challenges In Slim Long Horizontal Wells: A Case Study From The Biggest Gas Field In The Middle East.
-
Alternate 25011Technology Progression In Loss Circulation Spacer Deployment Across A Narrow Pressure Window For Critical Liner Cement Job
-
Alternate 25075Enhancing The Performance Of Oil-based Drilling Fluids With A Novel Modified Clay
-
Alternate 25049Geomechanics And Drilling Fluid Approach/solution In Eliminating Stuck Pipe Incidents In Weak Shale Formation And Highly Depleted Brown Field