Technical Session 13: Advancing Production Through Artificial Lift I
Thursday, 25 March
Lotus Suite 10, Level 22
Technical Session
Session Chairpersons
-
0900-0930 25672First Offshore Application Of Through Tubing Gas Lift Enhancement Tool: A Success Story In Offshore Sabah
-
0930-1000 25665Unlocking Mature Field Production Through Esp Deployment Below Perforations In Onshore Sumatra
-
1000-1030 25518Lessons Learnt In First Installation Of Rigless Wireline-style Deployed High-capacity Esp System
-
Alternate 25499Installation Of Malaysia's Deepest Through-tubing Deep Gas Lift System To Revive A Non-producing Mature Offshore Well
-
Alternate 25589Reducing Energy Intensity In Artificial Lift Operations Through Digital Optimization Of Esp Systems
-
Alternate 25710The First Comprehensive Reliability-centric Framework For Esp Protector Selection: A Novel Multi-dimensional Design Matrix For Maximizing Run-life Across All Downhole Conditions
-
Alternate 25688Intelligent Digital Twin Optimization Of Esp Operated Wells For Sustainable Production Operations
-
Alternate 25337Improving Esp Reliability In High-temperature Wells Through Integrated Thermal Management And Closed-loop Vsd Control
-
Alternate 25579Downhole Multiphase Pump Field Trial: Performance Evaluation For Production Enhancement, Tubing Leak Mitigation, And Reserve Recovery In Mature Beam Pump Wells
-
Alternate 25462Real-time ESP Optimization Under Dynamic Multi-Phase Flow: A Data-driven Approach For Enhanced Efficiency And Power Consumption Reduction
-
Alternate 25597Revolutionizing Esp Reliability: Surface-modification Technology As A Sustainable Alternative To Reactive Interventions With Low-surface-energy Coatings











