Technical Session 30: Operations and Capital Projects II
Thursday, 25 March
Lotus Suite 10, Level 22
Technical Session
-
1600-1630 25735Investigation On Impacts Of Artificial Reef Structure From Retired Wellhead Platform Jacket To Water Level, Flow Velocity And Water Circulation Using Physical Modeling
-
1630-1700 25277From New Build To Total Reuse - A Step Change In Offshore Wellhead Platform Lifecycle Management
-
1700-1730 25763From Stalled To Sanctioned: Unlocking Sapih Tiram Wangsa Marginal Gas Field Development
-
Alternate 25458Arthit Field: Low-pressure Operation For Production Enhancement
-
Alternate 25386Pioneering Remote Compressor Relocation and Refurbishment Project
-
Alternate 25691Strategic Reconstruction Of Refining Capacity Under Geopolitical Risk: A Portfolio Reallocation Framework Informed By Kuwait's Downstream Experience
-
Alternate 25634Optimizing Risk-Based Inspection Using Structural Health Monitoring (SHM)-Informed Structural Reliability Analysis
-
Alternate 25380Wellhead Platform Power System Design Improvement To Enhance Reliability And Operability
-
Alternate 25582Transforming Marginal Soils Into Engineered Fill: A Cost-carbon Optimization Framework For Supply-constrained Developments











