Technical Session 40: Advanced Techniques in Well Production
Friday, 26 March
Lotus Suite 3-4, Level 22
Technical Session
Session Chairpersons
-
1100-1130 25310Integrated Design And Execution Enable Single-run Coil Tubing Milling Of Multiple Barriers In A Long Horizontal Open-hole Packer Completion Well
-
1130-1200 25484Method And Device For Online Synchronous Metering Of Multiphase Flow Using Magnetic Resonance Under Continuous-flow Conditions
-
1200-1230 25609Wireline Deployed Acid Stimulation Via Y-tool - An ESP Case Study
-
Alternate 25745A Reservoir-Wellbore-Surface Coupling Model For Shale Gas Production Forecasting And Optimization: A Field Study From The Sichuan Basin
-
Alternate 25726Case Study From Offshore India: Sustained Increase In Oil Production And Reduction In Water Production In A High-h₂S, High-permeability Sandstone Reservoir By Bullheading A Relative Permeability Modifier
-
Alternate 25463Tailored Approach For Refracturing In Screenless Sand Control Well
-
Alternate 25683In-situ Foam Generation To Address Liquid Buildup Issues Under High Temperature And Salinity Condition
-
Alternate 25512From Tactical Interventions To Portfolio Value A Rigless Reactivation Playbook For Sustaining Mature Brownfields
-
Alternate 25585Improving Productivity And Proppant-Placement Reliability Through Channel Fracturing In Tight-Sand Reservoirs Of A Mature Oil Field In Thailand
-
Alternate 25619Zonal Isolation And Water Shutoff In A Depleted Carbonate Loss Zone Using Highly Thixotropic Cement Via 1.232in ID Coil Tubing Pump-and-pull Technique











